The Payneham Memorial Swimming Centre redevelopment by ARCH revives a 1968 municipal pool into a contemporary aquatic, recreation and community precinct to serve Adelaide’s eastern suburbs.
The redevelopment replaces a deteriorating, single-purpose seasonal outdoor facility with a new year-round community asset with a 25-metre indoor pool and 50-metre outdoor pool, along with various leisure and social spaces.

For the backstroke swimmers out there, you’ll be glad to know the ceiling in this swimming centre has received the utmost care and attention, giving you something to admire while clocking your laps. For those who don’t dabble in this particular stroke, it may be time to try.
The sweeping prefabricated hybrid steel and glulam structural canopy is the defining feature of the design. Engineered for the humid, chloramine-rich aquatic environment, the glulam structure offers a durable alternative to corrosion-prone steel while improving acoustics and adding warmth, interest and human scale to the expansive indoor pool hall. Spanning the interior space before carrying through to a cantilevered exterior, the ceiling design unites the indoor and outdoor spaces.

It was developed through advanced digital modelling and modular prefabrication, which reduced on-site assembly time, crane movements and construction risk.
A large operable glazing wall opens onto the outdoor aquatic areas, blurring the boundary between indoor and outdoor spaces. For most of the year, the temperate Adelaide climate is receptive to natural ventilation and passive environmental control, reducing reliance on energy-intensive mechanical systems while improving air movement, user comfort and connections to the outdoors. Beyond its thermal properties, the design also introduces extensive glazing to bring morning sun into the pool hall.
“The Swimming Centre is designed in harmony with the Adelaide climate. It opens up and embraces the natural ventilation possible in this temperate region,” says Michael Hegarty, principal architect and design director at ARCH. “The building breathes. It can also operate in closed mode when required due to extreme heat or during winter low temperatures. The swimmers can therefore enjoy the calm space below the canopy formed by the mass-timber diagrid hybrid structure. ARCH created a new place that works in harmony with the South Australian climate rather than fighting against it.”


The western elevation is designed in a chevron arrangement of pre-cast concrete and glass, with the high quality concrete absorbing the extreme afternoon heat of the western sun and dissipating that heat over time. The chevron form also delivers acoustic calm, privacy from the passing traffic and subtle daylight into the indoor pool hall. There is also a nice synchronicity to the chevron arrangement opposite the operable glazed panels.
While the building has been designed to reduce energy demand, there are inevitable operational needs such as heating the indoor pool. The 100 percent electric facility generates power on-site through 309 solar panels, which generate 140 kilowatts of renewable energy.
Water management was another key operational consideration. A smart water management and filtration system circulates and cleans 10,000 litres of water per minute, dramatically minimising water waste, while optimising chemical use across the 1900 square metres of swimming space.
Outside, 1800 square metres of new landscaping, urban greening and tree canopy expansion, including tree 38 species, help to offset the heat island effect of car parking on the site.


ARCH and the local council have delivered a local facility designed to see generations through their swimming education and aquatic fitness journey. But it’s also a place for fun. Beyond the lap pools, the centre also includes a new 14-metre waterslide tower that has two waterslides, while a zero-depth waterplay area for young children provides a supervised outdoor splash zone away from the main pool facilities.
The centre also includes a warm-water pool for swim school programs and baby classes, and is fully accessible with universal access ramps and lifts.
“We crafted this place, the actual building fabric, as a celebration of the high-quality trades available locally, especially the exceptional pre-cast concrete, tiling and brickwork, resulting from skilled people who settled locally as part of post-war migration,” says Hegarty. “It is therefore a deeply personal place of memory where past generations swam, ensuring families can continue to build those intergenerational connections for decades to come.”
Photos: Brett Boardman.
Bringing Australia’s architecture and design community into focus since 2009.